ELECTRICIAN 2nd YEAR WEEK WISE NSQF SYLLABUS (SPILT UP)
WEEK. NO. 36
- Reference Learning Outcome :- Plan, assemble and install solar panel.
- Duration :- Professional Skill 25 Hrs.; Professional Knowledge 07 Hrs. (for above learning out come)
TRADE THEORY (Professional Knowledge ) :-
-
- Various ways of electrical power generation by non-conventional methods.
- Power generation by solar and wind energy.
- Principle and operation of solar panel.
TRADE PRACTICAL (Professional Skills With Indicative Hours) :- Job no. & Name of the Practical
- 185. Prepare layout plan and Identify different elements of solar power system. (05 Hrs.)
- 186. Prepare layout plan and Identify different elements of wind power system. (05 Hrs.)
- 187. Assemble and connect solar panel for illumination. (15 Hrs.)
WEEK. NO. 37
- Reference Learning Outcome :-Erect overhead domestic service line, outline various power plant layout and explain smart distribution grid and its components. (Mapped NOS: PSS/N0106)
- Duration :- Professional Skill 44 Hrs.; Professional Knowledge 10 Hrs. (for above learning out come)
TRADE THEORY (Professional Knowledge ) :-
-
- Transmission and distribution networks.
- Line insulators, overhead poles and method of joining aluminum conductors.
TRADE PRACTICAL (Professional Skills With Indicative Hours) :- Job no. & Name of the Practical
- 188. Practice installation of insulators used in HT/LT line for a given voltage range. (04hrs.)
- 189. Draw single line diagram of transmission and distribution system. (04Hrs.)
- 190. Measure current carrying capacity of conductor for given power supply. (04hrs.)
- 191. Fasten jumper in pin, shackle and suspension type insulators. (07Hrs.)
WEEK. NO. 38
- Reference Learning Outcome :-Erect overhead domestic service line, outline various power plant layout and explain smart distribution grid and its components. (Mapped NOS: PSS/N0106)
- Duration :- Professional Skill 44 Hrs.; Professional Knowledge 10 Hrs. (for above learning out come)
TRADE THEORY (Professional Knowledge ) :-
-
- Safety precautions and IE rules pertaining to domestic service connections.
- Various substations.
- Various terms like – maximum demand, average demand, load factor, diversity factor, plant utility factor etc.
TRADE PRACTICAL (Professional Skills With Indicative Hours) :- Job no. & Name of the Practical
- 192. Erect an overhead service line pole for single phase 230V distribution system in open space. (10 Hrs.)
- 193. Practice on laying of domestic service line. (10 Hrs.)
- 194. Install bus bar and bus coupler on LT line. (5 Hrs.)
WEEK. NO. 39
- Reference Learning Outcome :-Examine the faults and carry out repairing of circuit breakers. (Mapped NOS: PSS/N7001)
- Duration :- Professional Skill 25 Hrs.; Professional Knowledge 04 Hrs. (for above learning out come)
TRADE THEORY (Professional Knowledge ) :-
-
- Transmission and distribution networks.
- Line insulators, overhead poles and method of joining aluminum conductors.
TRADE PRACTICAL (Professional Skills With Indicative Hours) :- Job no. & Name of the Practical
- 195. Identify various parts of relay and ascertain the operation. (5 Hrs.)
- 196. Practice setting of pick up current and time setting multiplier for relay operation. (5 hrs.)
- 197. Identify the parts of circuit breaker, check its operation. (5Hrs.)
- 198. Test tripping characteristic of circuit breaker for over current and short circuit current. (5 hrs.)
- 199. Practice on repair and maintenance of circuit breaker. (5 hrs.)
WEEK. NO. 40
- Reference Learning Outcome :-Install and troubleshoot Electric Vehicle charging stations.
- Duration :- Professional Skill 22 Hrs.; Professional Knowledge 04 Hrs. (for above learning out come)
TRADE THEORY (Professional Knowledge ) :-
-
- EV scenario in India and EV Charging basic theory.
- EV Charging safety requirements.
TRADE PRACTICAL (Professional Skills With Indicative Hours) :- Job no. & Name of the Practical
- 200. Demonstrate different charger specifications. (05 hrs)
- 201. Perform installation of EV charging Station for Public places. (10 hrs)
- 202. Perform installation of Home EV charging stations. (10 hrs)