DRAUGHTSMAN MECHANICAL 2nd YEAR WEEK WISE NSQF SYLLABUS (SPILT UP)

WEEK. NO. 39 

  1. Reference Learning Outcome :-Create and plot assembly and detail views of machine part with Dimensions, Annotations, Title Block and Bill of materials in SolidWorks/AutoCAD Inventor/ 3D Modeling. (Mapped NOS: CSC/NO402)
  2. Duration :- Professional Skill 120 Hrs.; Professional Knowledge 26  Hrs. (for above learning out come)
TRADE THEORY (Professional Knowledge ) :- 
    • Difference between sweep and loft.
    • Exploded views – Configuration manager, Animation controller.
    • Annotating Holes and Threads, Creating Centerlines, symbols and leaders, Simulation.
    • Introduction to plot & Different ways of plotting. (07 hrs.)
TRADE PRACTICAL (Professional Skills  With Indicative Hours) :- Job no. & Name of the Practical
  • 142. Create a 3D transition figure
     using loft feature. (03 hrs)
     using sweep feature. (03 hrs)
     using library features.(03 hrs)
    i) Create 3D model by annotating Holes and Threads, (03 hrs)
    ii) Create Centerlines, symbols and leaders, (03 hrs)
    iii) Create Simulation. (03 hrs)
    iv) Plot the model. (01 hr)
  • 143. Convert or save as Solid Works and Inventor file into .dwg format. (03 hrs)

WEEK. NO. 38

  1. Reference Learning Outcome :- Create production drawing of machine part. (Mapped NOS: CSC/NO402)
  2. Duration :- Professional Skill 24 Hrs.; Professional Knowledge 06  Hrs. (for above learning out come)
TRADE THEORY (Professional Knowledge ) :- 
    • Knowledgeof production drawing, name plate and bill of materials, etc.
    • Study of production drawing.
    • Procedure of preparing Revision Drawing: putting revision mark, writing remarks in the table as per check list. (06 hrs.)
TRADE PRACTICAL (Professional Skills  With Indicative Hours) :- Job no. & Name of the Practical
  • 144. Create production drawing of a simple Drill jig – Part model – assembly-detailing (using CAD). (12 hrs)
  • 145. Create production drawing of a Screw jack – Part model – assembly-detailing. (10 hrs) (using CAD)
  • 146. Create a check list by self-assessment and provide Revision mark by noting in the Revision table. (02 hrs)
error: Content is protected !!
Scroll to Top