DRAUGHTSMAN MECHANICAL 2nd YEAR WEEK WISE NSQF SYLLABUS (SPILT UP)

Table of Contents (MENU)

WEEK. NO. 35

  1. Reference Learning Outcome :-Create and plot assembly and detail views of machine part with Dimensions, Annotations, Title Block and Bill of materials in SolidWorks/AutoCAD Inventor/ 3D Modeling. (Mapped NOS: CSC/NO402)
  2. Duration :- Professional Skill 120 Hrs.; Professional Knowledge 26  Hrs. (for above learning out come)
TRADE THEORY (Professional Knowledge ) :- 
    • Introduction to SolidWorks/ AutoCAD Inventor/ 3D Modeling
    • User interface – Menu Bar – Command manager – Feature manager – Design Tree – settings on the Default options – suggested settings – key board short cuts.
    • Create the best profile – create a sketch – create a new part. (07 hrs.)
TRADE PRACTICAL (Professional Skills  With Indicative Hours) :- Job no. & Name of the Practical
  • SolidWorks/AutoCAD Inventor/ 3D Modeling:
  • 135. Draw 3D solid figures by Sketching features & applied features. (08 hrs)
  • 136. Sketch an angle plate and a block – Create/ Modify constraints. (06 hrs)
  • 137. Create a sketch of a new part. (08 hrs)

WEEK. NO.  36

  1. Reference Learning Outcome :-Create and plot assembly and detail views of machine part with Dimensions, Annotations, Title Block and Bill of materials in SolidWorks/AutoCAD Inventor/ 3D Modeling. (Mapped NOS: CSC/NO402)
  2. Duration :- Professional Skill 120 Hrs.; Professional Knowledge 26  Hrs. (for above learning out come)
TRADE THEORY (Professional Knowledge ) :- 
    1. Extrude bosses and cuts, add fillets, and chamfer changing dimensions.
    2. Revolved features using axes, circular patterning changes and Rebuild problems. (07 hrs.)
TRADE PRACTICAL (Professional Skills  With Indicative Hours) :- Job no. & Name of the Practical
  • 138. Create 3D solid and edit using:
    i) Copy & Paste, (03 hrs)
    ii) Filleting, (03 hrs)
    iii) Chamfering, (03 hrs)
  • iv) Editing a feature definition. (03 hrs)
    v) Create ribs, mirror pattern, the Hole wizard, (03 hrs)
    vi) Create part configurations, Part design tables, (03 hrs)
    vii) Inset Design Table, Inset new design table. (03 hrs)

WEEK. NO. 37

  1. Reference Learning Outcome :-Create and plot assembly and detail views of machine part with Dimensions, Annotations, Title Block and Bill of materials in SolidWorks/AutoCAD Inventor/ 3D Modeling. (Mapped NOS: CSC/NO402)
  2. Duration :- Professional Skill 120 Hrs.; Professional Knowledge 26  Hrs. (for above learning out come)
TRADE THEORY (Professional Knowledge ) :- 
    • Bottom up assembly modeling
    • Components configuration in an assembly, Insert subassemblies, Interference detection. (07 hrs.)
TRADE PRACTICAL (Professional Skills  With Indicative Hours) :- Job no. & Name of the Practical
  • 139. Create New assembly part:
    i) Create a new assembly (06 hrs)
    ii) Insert components into an assembly, (03 hrs)
    iii) Add mates (degree of freedom). (03 hrs)
    iv) Perform components configuration in an assembly, (03 hrs)
    v) Insert subassemblies, (03 hrs)
    vi) Perform Interference detection. (03 hrs)

WEEK. NO. 38

  1. Reference Learning Outcome :-Create and plot assembly and detail views of machine part with Dimensions, Annotations, Title Block and Bill of materials in SolidWorks/AutoCAD Inventor/ 3D Modeling. (Mapped NOS: CSC/NO402)
  2. Duration :- Professional Skill 120 Hrs.; Professional Knowledge 26  Hrs. (for above learning out come)
TRADE THEORY (Professional Knowledge ) :- 
    • Drawings & Detailing, create drawing sheets, Add drawing items, Named views, std. 3 views, auxiliary views, section views, detail views.
    • Drawings & Detailing, create drawing sheets, Add drawing items, Named views, standard 3 views, auxiliary views, section views, detail views. (07 hrs.)
TRADE PRACTICAL (Professional Skills  With Indicative Hours) :- Job no. & Name of the Practical
  • 140. Create a 3D model putting:
    i) Driving dimensions, (02 hrs)
    ii) Bill of materials, (02 hrs)
    iii) Driven (Reference) Dimensions, (02 hrs)
    iv) Annotations, (02 hrs)
    v) Alternate position view. (02 hrs)
  • 141. Prepare drawings & detailing:
    i) Create drawing sheets, (02 hrs)
    ii) Add drawing items, (02 hrs)
    iii) Named views, standard 3 views, auxiliary views,section views, detail views. (02 hrs)
    iv) Reattach and replace dimensions, (02 hrs)
    v) Edit sketch, (02 hrs)
    vi) Edit sketch plane, (02 hrs)
    vii) Edit definition. (02 hrs)
error: Content is protected !!

Table of Contents (MENU)

Index
Scroll to Top