DRAUGHTSMAN CIVIL 2nd YEAR WEEK WISE NSQF SYLLABUS (SPILT UP)
WEEK. NO. 18 & 19
- Reference Learning Outcome :-Draw the cross sectional view of different types of roads showing component parts using CAD. (Mapped NOS: IES /N9429)
- Duration :- Professional Skill 56 Hrs.; Professional Knowledge 16 Hrs.(for above learning out come)
TRADE THEORY (Professional Knowledge ) :-
-
- Roads:-
- Introduction.
- History of highway development.
- General principles of alignment.
- Classification and construction of different types of roads,
- Component parts.
- Road curves, gradient.
- Curves-types, designation of curves.
- Setting out simple curve by successive bisection from long chords.
- simple curve by offsets from long chords.
- Road drainage system.
TRADE PRACTICAL (Professional Skills With Indicative Hours) :- Job no. & Name of the Practical
- Roads:-
- 142. Draw showing road structure and component parts. (18hrs)
- 143. Prepare a drawing of Cross-sections showing the different types of roads-accordingto location & materials. (20hrs)
- 144. Prepare a drawing of road curves & gradient. (18hrs)
WEEK. NO. 20 & 21
- Reference Learning Outcome : Draw the details of different types of culverts using CAD. (Mapped NOS: IES /N9430) Prepare detailed drawing a bridge using CAD. (Mapped NOS: IES /N9431)
- Duration :- Professional Skill 56 Hrs.; Professional Knowledge 16 Hrs.(for above learning out come)
TRADE THEORY (Professional Knowledge ) :-
-
- Bridges &Culvert:-
- Introduction to bridges.
- Component parts of bridge.
- Classification of culverts.
- IRC loading.
- Selection of type and location.
- Factors governing the ideal site.
- Alignment of bridge.
- Foundation -selection-caisson.
- Coffer dam- types.
- Types of super structure.
- Substructure-piers, abutments, wing walls.
- Classification of bridge.
- Tunnels- rules used for the sizes of different members.
TRADE PRACTICAL (Professional Skills With Indicative Hours) :- Job no. & Name of the Practical
- Bridge &Culvert :-
Prepare drawing of –
- 145. Different types of culvert. (10hrs)
- 146. Preparing drawing of an arched bridge. (10 hrs)
- Draw plan and sectional views of the following:-
- 147. R.C.C Slab Culvert with splayed wing walls. (12hrs)
- 148. Steel Foot over bridge across a highway. (12hrs)
- 149. Two span Tee Beam Bridge with square returns. (12hrs)