DRAUGHTSMAN CIVIL 2nd YEAR WEEK WISE NSQF SYLLABUS (SPILT UP)

WEEK. NO. 18  & 19

  1. Reference Learning Outcome :-Draw the cross sectional view of different types of roads showing component parts using CAD. (Mapped NOS: IES /N9429)
  2. Duration :- Professional Skill 56 Hrs.; Professional Knowledge 16 Hrs.(for above learning out come)
TRADE THEORY (Professional Knowledge ) :- 
    • Roads:-
    •  Introduction.
    •  History of highway development.
    •  General principles of alignment.
    •  Classification and construction of different types of roads,
    •  Component parts.
    •  Road curves, gradient.
    •  Curves-types, designation of curves.
    •  Setting out simple curve by successive bisection from long chords.
    •  simple curve by offsets from long chords.
    •  Road drainage system.
TRADE PRACTICAL (Professional Skills  With Indicative Hours) :- Job no. & Name of the Practical
  • Roads:-
  • 142. Draw showing road structure and component parts. (18hrs)
  • 143. Prepare a drawing of Cross-sections showing the different types of roads-accordingto location & materials. (20hrs)
  • 144. Prepare a drawing of road curves & gradient. (18hrs)

WEEK. NO. 20 & 21

  1. Reference Learning Outcome : Draw the details of different types of culverts using CAD. (Mapped NOS: IES /N9430) Prepare detailed drawing a bridge using CAD. (Mapped NOS: IES /N9431)
  1. Duration :- Professional Skill 56 Hrs.; Professional Knowledge 16 Hrs.(for above learning out come)
TRADE THEORY (Professional Knowledge ) :- 
    • Bridges &Culvert:-
    •  Introduction to bridges.
    •  Component parts of bridge.
    •  Classification of culverts.
    •  IRC loading.
    •  Selection of type and location.
    •  Factors governing the ideal site.
    •  Alignment of bridge.
    •  Foundation -selection-caisson.
    •  Coffer dam- types.
    •  Types of super structure.
    •  Substructure-piers, abutments, wing walls.
    •  Classification of bridge.
    •  Tunnels- rules used for the sizes of different members.
TRADE PRACTICAL (Professional Skills  With Indicative Hours) :- Job no. & Name of the Practical
  • Bridge &Culvert :-
    Prepare drawing of –
  • 145. Different types of culvert. (10hrs)
  • 146. Preparing drawing of an arched bridge. (10 hrs)
  • Draw plan and sectional views of the following:-
  • 147. R.C.C Slab Culvert with splayed wing walls. (12hrs)
  • 148. Steel Foot over bridge across a highway. (12hrs)
  • 149. Two span Tee Beam Bridge with square returns. (12hrs)