WEEK. NO. 22 & 23
- Reference Learning Outcome :-Draw different types of roofs, truss according to shape, construction, purpose and span(Mapped NOS: IES /N9422)
- Duration :- Professional Skill 56 Hrs.; Professional Knowledge 18 Hrs.(for above learning out come)
TRADE THEORY (Professional Knowledge ) :-
-
- Roofs & Roof coverings: –
- purposes,Elements, Types, Fla, pitched.
- Truss-king post, queen post, mansard, bel-fast, steel, composite.
- Roof & coverings – objectives, types & uses.
(18 hrs.)
TRADE PRACTICAL (Professional Skills With Indicative Hours) :- Job no. & Name of the Practical
- Drawing details of:-
- 51. Slopped/Pitched Roof Truss – King Post and Queen Postroof trusses showing detailed connections. (23hrs)
- 52. Steel roof trusses showing detailed connections. (21hrs)
- 53. Wooden roof truss, showing detailed connections. (12hrs)
WEEK. NO. 24, 25 & 26
- Reference Learning Outcome :
- Perform site survey with chain / tape and prepare site plan. (Mapped NOS: IES /N9417)
- Perfom site survey with prismatic compass and prepare site plan. (Mapped NOS:/N9418)
- Perform site survey with plane table and prepare a map. (Mapped NOS: IES /N9412)
- Duration :- Professional Skill 84 Hrs.; Professional Knowledge 18 Hrs.(for above learning out come)
TRADE THEORY (Professional Knowledge ) :-
-
- Surveying:-
- Introduction, History and principles of chain survey.
- Instrument employed.
- Use, care, maintenance and common terms.
- Classification, accuracy, types.
- Main divisions (plane & geodetic).
- Chaining.
- Speed in field and office work.
- Knowledge of Mouza Map.
Compass survey:-
- Instrument and its setting up
- Bearing and each included angle of close traverse.
- Local attraction.
- Magnetic declination and its true bearing.
- Precaution in using prismatic compass.Plane table survey:-
- Instrument used in plane table survey
- Care and maintenance of plane table
(18 hrs.)
TRADE PRACTICAL (Professional Skills With Indicative Hours) :- Job no. & Name of the Practical
- Surveying:-
Chain Survey :- (35 hrs.)
- 54. Equipment and instrument used to perform surveying.(06hrs)
- 55. Distance measuring with chainand tape. (08hrs
- 56. Entering Field book and plotting. (05hrs)
- 57. Calculating the area of site. (07hrs
- 58. Prepare site planwith the helpof Mouza map. (09hrs
Compass survey:- (42hrs)
- 59. Field work of prismatic compass survey. (07hrs)
- 60. Plotting of prismatic compasssurvey. (05hrs)
- 61. Testing and adjusting thecompass. (08hrs)
- 62. Observation of bearings. (08hrs)
- 63. Bearing a line. (05hrs)
- 64. F.B.,B.B., R.B.,W.C.B. of a Line,Traverse and also checkthe close traversing. (09hrs)
Plane Table Survey :- (07hrs)
- 65. Surveying of a Building sitewith Plane Table. (07hrs)